Open Access
Refine
Document Type
- Conference Proceeding (12)
- Article (9)
Language
- English (21) (remove)
Is part of the Bibliography
- yes (21)
Keywords
- virtual reality (9)
- Business Process Management Systems (4)
- Fuzzy Logic (4)
- visualization (4)
- Assignment Automation (2)
- Augmented Reality (2)
- Business Process Modeling Notation (2)
- Git (2)
- Systems Modeling Language (SysML) (2)
- artificial neural networks (2)
- machine learning (2)
- software configuration management (2)
- software design pattern detection (2)
- software engineering (2)
- systems engineering (2)
- systems modeling (2)
- version control systems (2)
- Business Process Modelling (1)
- Re- source Assignment Automation (1)
- Resource Allocation Algorithms (1)
- Resource Assignment Automation (1)
- Rule Engines (1)
- Staff Assignment Algorithms (1)
- augmented virtuality (1)
- business process management (1)
- business process mining (1)
- code coverage (1)
- data pipelines (1)
- data stream processing (1)
- event stream processing (1)
- event-driven architecture (1)
- graph analysis (1)
- graph embeddings (1)
- integrated development environments (1)
- mixed reality (1)
- process analysis (1)
- process mining (1)
- requirements traceability (1)
- rule-based expert system (1)
- software requirements traceability (1)
- software test coverage (1)
- software test traceability (1)
- software testing (1)
- software verification and validation (1)
Institute
Industry 4.0 production comprises complicated highly automated processes. However, human activities are also a crucial component of these processes, e.g., for machine main- tenance. Task assignment of human resources in this domain is challenging, as many factors have to be taken into account to ensure effective and efficient activity execution and satisfy special conditions (like worker safety). To overcome the limita- tions of current Business Process Management (BPM) Systems regarding activity resource assignment, this contribution provides a BPM-integrated approach that applies fuzzy sets for activity assignment. Our findings suggest that this approach can be easily applied to complex production scenarios, while providing efficient performance even with a large number of concurrent activity assignment requests. Additionally, our evaluation shows its potential for improved work distribution which can lead to cost savings in Industry 4.0 production processes.